📹Mitsubishi Electric News Release “Mitsubishi Infrastructure Monitoring System II” measurement and analysis service started    20171106

📹Mitsubishi Electric News Release “Mitsubishi Infrastructure Monitoring System II” measurement and analysis service started

Features of “MMSD® II”

– Taking high-definition images of tunnel walls while running, reducing visual inspection workload

  1. ·Taking high-resolution images of the entire circumference of the tunnel while running while using the 8 K high resolution line camera with auto focus function and laser lighting
  2. ·Confirmation of bolt installation state, leakage condition and crack etc. realized with the accuracy equivalent to visual inspection
  3. ·Equipped with railway tracking equipment, applicable to both road and railway

– Accurately grasp the current status of structures and equipment with high-density three-dimensional data and realize efficient inspection

  1. ·Two high-density lasers capable of measuring 1 million points per second are mounted, and high-density three-dimensional point cloud data equivalent to 2 million points per second having position coordinates (latitude, longitude, altitude) with accuracy of millimeter are collected
  2. ·Even if the design drawing or the completed construction drawing is old or does not exist, accurately grasp the current state of the structure from the measured three-dimensional data
  3. ·Detect aging by comparing with past measurement data of the same place, narrow down inspection points

 

– It automates the creation / analysis work of the deformation development map which was carried out manually, and shortens the working time

  1. ·Automatic detection of cracks of 0.3 mm width by our proprietary image analysis algorithm * 2
  2. ·Automatic detection of deformation such as cracking and delamination caused by cracks from the results of dimensional data analysis and crack analysis
  3. ·It automatically reflects the detected result in the deformation development drawing and reduces drawing work time such as inspection time and design time which was manually created

 

http://www.mitsubishielectric.co.jp/news/2017/1106.html?cid=rss